
HS2012 evaluation
12 May 2013
Fluid have been commissioned by the GLA to carry out an evaluation of the HS2012 project, the regeneration of the 6Km avenue linking the city with Stratford. The original vision and area studies were completed by Fluid in 2009 and launched by the Mayor in 2010. A significant number of projects have been delivered up to 2012 for the London Olympics.
